Current language: English

Routine inspections: Elsen Bridge closed at night

Elsenbrücke

Four weeks after the commissioning of the temporary bridges over the Spree, they have to be routinely inspected. For this purpose, the two structures are partially or completely closed at night.

Closures on Thursday and Friday

This was announced by the Senate Department for the Environment, Urban Mobility, Consumer Protection
and Climate Action on Thursday (Feb. 3, 2022). To inspect the bolted connections, the temporary bridge will be completely closed to motor vehicle traffic in the direction of Friedrichshain (towards the city center) between Thursday, February 3 at 8 PM and Friday, February 4 at 6 AM. Cyclists as well as public transport can continue to use the bridge during the inspection work. Motorists will have to use Oberbaum Bridge. The second temporary bridge, which leads out of the city, will not be fully closed: From February 4, 8 PM until Saturday, February 5 at 6 AM, traffic will be restricted to one lane.

Author: BerlinOnline/deepl.com
Publication date: 3 February 2022
Last updated: 3 February 2022

More News

Sommer im Freibad

Midsummer: Swimming from sunrise to sunset

Swimming from dawn to dusk and music in the afternoon: On the longest day of the year, you can switch back and forth between the pool and the Fête de la Musique at the Insulaner summer pool.  more

Application for a Residence Permit

Senate grants right to remain in 186 cases of hardship

In numerous cases involving exceptional hardship in disputes over the right of foreign nationals to leave or remain in the country, the Senate has, for the most part, granted permission for them to continue residing in Germany.  more