Current language: English

Berlin Brandenburg Airport (BER)

On October 31, 2020, the Berlin Brandenburg Airport "Willy Brandt" opened: a view of and into the completed Airport BER.

  • Airport Berlin Brandenburg

    The lettering on the entrance of the main hall of Airport Berlin Brandenburg (BER).

  • Airport Berlin Brandenburg
  • Beginn der Sommerferien Berlin

    Travelers wait at the ceck-in inside Terminal 1 of Airport Berlin-Brandenburg (BER) at the beginning of the summer holidays.

  • BER (9)

    View into the bright and spacious hall of Terminal 1 of Berlin Brandenburg Airport. Terminal 1 is the largest terminal of the airport.

  • BER (1)

    The main terminal of Berlin Brandenburg Airport "Willy Brandt" (BER) is reflected in the water of a fountain.

  • Flughafen Berlin Brandenburg

    In Terminal 1, the portrait with a quotation from Willy Brandt was mounted on a wall. Germany's fourth chancellor is the namesake of the new major airport.

  • BER (6)

    Check-in counter in Terminal 1 of the new Berlin Brandenburg Willy Brandt Airport (BER). In the main hall, passengers can check in at eight islands with a total of 118 counters.

  • BER (5)

    Passengers can check in for their flights at over 100 counters in Terminal 1 of BER. In addition to the classic counters, passengers can use baggage machines for online check-in via smartphone.

  • BER (4)

    Above the check-in counters in Terminal 1, the artwork of Californian artist Pae White "The Magic Carpet" hangs under the ceiling.

  • BER (7)

    The entrance to the security control in Terminal 1 of the new Berlin Brandenburg Airport Willy Brandt (BER).

  • BER Terminal 2 (3)

    Baggage handling in Terminal 2 of Berlin-Brandenburg Airport (BER). Terminal 2 serves as a departure and arrival terminal and has a capacity of six million passengers per year.

  • BER Terminal 2 (1)

    A body scanner is located in the security check area in Terminal 2 of Berlin-Brandenburg Airport (BER).

  • BER Terminal 2 (2)

    The arrivals area in Terminal 2 of BER Airport.

  • Terminal 5

    Der neue Schriftzug «BER Terminal 5» leuchtet am Abend auf dem Dach vom ehemaligen Flughafens Berlin Schönefeld. Mit der Eröffnung des neuen Hauptstadtflughafens wird der Flughafen Schönefeld zum Terminal 5 des BER.

  • BER (11)

    The S-Bahn station of the new Berlin Brandenburg Airport (BER) is served by lines S9 and S45.

  • Flughafen Berlin Brandenburg

    View of Terminal 1 before the opening of Berlin Brandenburg Airport Willy Brandt.

  • BER (3)

    View of the terminal with the apron from Berlin Brandenburg Airport "Willy Brandt" (BER).

  • Flughafen Berlin Brandenburg

    Aircraft from Easyjet are parked in front of Terminal 1 before the opening of Berlin Brandenburg Willy Brandt Airport and are waiting for their deployment.

  • BER (2)

    An air force aircraft flies behind the tower of Berlin Brandenburg Airport.